Web Truss Column Install

Video Description

This installation video covers installing web-truss columns as part of the primary structural frame during the steel-building assembly process. The tutorial shows where the columns fit within the building system and why their placement is essential to the frame. Viewers are introduced to column positioning, alignment, and preparation for the roof-truss connections, making the tutorial useful for both first-time DIY builders and experienced jobsite crews.

What You'll Learn

  • Where web-truss columns belong in the frame
  • How to position and align the columns
  • How to prepare the columns for truss connections

Video Transcript

Congratulations on taking delivery of your new World Wide Steel building.

We know how excited you must be to assemble your building, and it’s important to pay extra attention to the next few steps to ensure your assembly goes as smooth as possible.

The foundation is a crucial step in your building process. Your foundation engineer, whether it be World Wide Steel or your independently contracted engineer, will determine the diameter, length, and type of anchor rod you’ll need to use. World Wide Steel does not provide anchor bolts for your project, and these must be supplied by you or your contractor.

For most building projects, you’ll have the option for your foundation supplier to cast the anchor rods in place when pouring your concrete or to install anchor bolts after the concrete has been poured. Your custom building has been drawn and engineered for a square and level concrete pad and/or piers. Problems with the foundation will lead to problems with assembly and poor overall building performance. Ensure your foundation is correct before assembly.

The paperwork delivered with your building has all the information for the layout and components of your specific building.

Remember, all buildings are custom-made to how the customer designed it. In this example, we are referencing a web truss building with 3 and five-eighth inch girts with post-installed anchor bolts. If your building consists of tube leg columns, then reference our tube leg column installation video.

All buildings are drawn on a grid system, or grid lines as they’re commonly referred to. When laying out your columns, the W1 drawing, or column layout plan, will give you measurements for proper column placement. Columns are labeled at the intersections of the truss lines, the numeric value highlighted in yellow, and the column lines, the alphabetic value highlighted in green. The trusses in your building kit correspond to these intersections and are labeled accordingly. The dimensions and grid lines shown on this W1 drawing represent the center line of the columns and base plates at each location.

Columns that are specific to a certain grid location, such as grids A and one, will be labeled as A1.

If you receive columns with no labeling, those columns are typical and can be used at any main building column location that does not have a specific labeled column.

Since we are using 3 and five-eighth inch girts, you will 1st measure 3 and five-eighth inches off the sidewall edge of slab and make a mark. This will be the outside face of the web truss column, as well as the outside edge of the base plate.

Measure 6 and five-eighth inches from the end wall edge of slab and make a mark. This will be the center line, or grid line, of your web truss column from the end wall. You have now identified the required dimensions to place your A1 column.

Along the sidewalls of your building, run a chalk line along the 3 and five-eighth inch measurement at each corner column and snap the line. Then measure from the end wall edge of slab over to the center line of your column at grid 2. From there, you can measure from center line to center line of each remaining column.

You are now ready to mark your anchor bolt locations for each column.

We encourage the use of a template for accuracy when laying out your anchor bolt locations. World Wide Steel does not provide this template, but it can be easily made out of plywood to match the base plate dimensions and hole locations shown on your foundation drawings.

Once your measurements have been pulled, align your template to center and mark where your anchor bolt holes should go. The anchor bolt holes will align perfectly with your column holes. At this time, remove the template and drill holes as required for anchor bolts.

It’s good practice to utilize compressed air to blow out any remaining dust in the drilled hole.

Your foundation engineer will specify how your anchor bolts will be secured, usually by wedge anchors or epoxy application.

Reference your F drawings for the required method.

Once your anchor bolts are secure, position the 1A column at the 1A outside corner intersection.

Stand the column upright and make sure it’s level and square.

Once it is level and square, anchor it down.

Continue anchoring the rest of your columns according to your specific W1 drawing.

Congratulations on taking the 1st steps to installing your new building. These steps are crucial to a successful build, so take your time, plan accordingly, and reach out to your World Wide Steel Buildings rep if you have any questions.

Got a Question?

Contact us to get started on your own steel building.

View SMS Terms & Conditions

By opting into SMS from a web form or other medium, you are agreeing to receive SMS messages from Worldwide Steel Buildings. This includes SMS messages for appointment scheduling, appointment reminders, post-visit instructions, lab notifications, and billing notifications. Message frequency varies. Message and data rates may apply. See privacy policy at https://www.worldwidesteelbuildings.com/privacy-policy/. Message HELP for help. Reply STOP to any message to opt out.

‹ Previous Video

Laying Out Your Building

Next Video ›

Installing Your Sidewall Girts

Testimonials

Real Stories. Real Results.

Posted on Google Google
Zach Zaroor profile picture
Zach Zaroor
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
I worked with Jayson in sales. Told him what we were looking for, plans changed, and he quickly adapted with them. He was helpful, always answers the phone, and is willing to walk you through anything in further detail that you need. I will be using not only Jayson, but Worldwide Steel Buildings again in the future.
Posted on Google Google
Clayton Ericson profile picture
Clayton Ericson
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Worked with Wendy on our project, she was very helpful from start to finish. Decided on a 24 x 36 hybrid building. The building went up without any real problems. If i did have any questions she was right there to answer my questions. I chose the hybrid version with wood purlins. This saved me about $2500 and made it easier to assemble by myself. Im very happy with my shop and have had no issues with it. Wendy made my project easier with her knowledge and help. Dean E.
Posted on Google Google
MattNC Video profile picture
MattNC Video
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience with WWSB and Wendy Wickenhauser in the process of designing, ordering and receiving my custom shop design. I was very pleased with the entire process, communication and product delivered. I built it myself and the included guidebook was also extremely helpful.
Posted on Google Google
Susan Bowers profile picture
Susan Bowers
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We are extremely satisfied with our Worldwide steel building. Wendy was very helpful with the design and making sure we thought about all options. Wendy and all the tech people were very helpful during the construction phase, which we did ourselves. I’m sure that sometimes our techniques were not OSHA approved, but no body died! lol.
Posted on Google Google
Krystal Burrows profile picture
Krystal Burrows
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
I’ve had a great experience working with Jerad Henry on my metal building project. He has spent hours with me going through the design and functionality of the building, answering questions, and offering insights I honestly wouldn’t have thought of on my own. His knowledge and patience made the entire process smooth and stress-free, and it’s clear he genuinely cares about getting the building right for my needs. It’s been a pleasure working with Jerad Henry, and I’m really looking forward to receiving and building the building.
Posted on Google Google
Bayou Construction & Consultants profile picture
Bayou Construction & Consultants
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
As a General Contractor, who has been building structures around the world, working with Jerad Henry and the team of professionals here at Worldwide Steel Buildings has been a fresh air experience. Jerad has made easy for us to provide great structures for clients from here in Texas to Colorado to South Carolina. The mixture of his dedication to the clients to his manufacturing team design and construction of the buildings to seamless delivery to the job site, has made our crews lives easy and efficient. Here is to our continued future working together. Thanks!!!
Posted on Google Google
Melissa 'Missy' Mihelich profile picture
Melissa 'Missy' Mihelich
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Jerad is an absolute gem! He has worked and helped us so much with our building... basically a Barndominium. Only positive experiences and thank you!
Posted on Google Google
Matt Brown profile picture
Matt Brown
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Wendy and the entire staff at World Wide were great to work with. I was very pleased with the customer service and building quality

Not Sure Which Roof System Is Right for Your Building? We can help!

Our team can help you compare roof system options based on your building use, budget, location, and desired appearance.

Back To Top