Learn the key considerations for stack drilling roof panels before they are placed on the building in a Worldwide Steel Buildings project. This preparation step can produce consistent fastener locations across multiple panels and improve installation efficiency. The video emphasizes panel alignment, correct orientation, and drilling patterns that match the roof framing so builders can approach the work with a clearer understanding of the component and its place in the finished structure.
What You'll Learn
- How to align roof panels in a drilling stack
- How to lay out consistent fastener locations
- How to match the drilling pattern to the roof framing
Video Transcript
World Wide Steel Buildings recommends pre-drilling roof panels before fastening them to your building.
When pre-drilling panels, we utilize a method called stack drilling. We recommend stack drilling no more than 20 panels at one time.
1st, you’ll need to identify the panels that are supposed to be installed for the roof surface you’re working on.
Refer to the sheet metal trim package list located in your ship list. This page will indicate what panels and lengths are to be used at each surface of your building. World Wide Steel typically bundles panels together for each surface on your building, but it’s a good idea to verify you have the correct panels before pre-drilling them for a surface.
World Wide Steel’s typical roof panel has a total of 5 high ribs and 8 smaller intermediate ribs. The high ribs are spaced 9 inches apart. The panel is designed to lap and has a 36-inch coverage. This is the dimension from the center of the 1st high rib to the center of the last high rib.
One side of your panel is referred to as the overlap edge, which is the side shown here.
The other side is referred to as the side lap edge, shown here.
When installing your roof panels, you may start from either the left or the right side of your building, working your way along the distance of your roof surface.
In our example, we’re starting from the left side and working to the right. Therefore, the overlap edge of our panels will be positioned on the left side when stack drilling.
If you elect to install from right to left, then your overlap edge will be positioned on the right side.
It’s important to correctly orient your panels before marking and drilling to ensure a proper fit.
Please contact your World Wide Steel Buildings rep if you have any questions.
It’s common practice to utilize a piece of wood and hammer to ensure the ends of all the panels in the stack are lined up. Once you have the end of the panels lined up, we recommend using 2 or more locking clamps to clamp the panels together at the end you lined up to help prevent any movement during drilling. To ensure our pre-drilled holes line up with the purlins, we will be using the story pole method as demonstrated in our wall panel stack drilling video.
1st, the end of your roof panel should extend beyond the outer corner of your eave trim by 2 inches as shown here.
Therefore, measure 2 inches up from the end of your story pole and make a mark. Ensure this mark lines up with the outside corner of the eave trim when placing your story pole on your roof purlins.
Depending on your building’s design, you may or may not have a wall panel separating your eave trim from your eave purlin as shown in these graphics. If no wall panel is present, then the fastener for your eave purlin needs to be located approximately one 4th inch upslope from the outside corner of your eave trim.
This will be the eave connection for your panels. When a wall panel is present, the wall panel thickness must be considered. Since the standard World Wide Steel Buildings wall panel has a thickness of 3 4ths of an inch, then the fastener for your eave purlin needs to be located approximately one inch upslope from the outside corner of your eave trim.
Proceed with marking your eave connection on your story pole.
For the other purlins, mark on the story pole at the middle of each purlin.
You are now ready to transfer these hole locations to your roof panel.
When locating your holes for attachment, holes should be drilled at the eave purlin location and all purlins toward the overlap side of the high ribs and should be placed between the high rib and the 1st intermediate rib, as shown here.
For the roof panel’s eave connections, it’s recommended to place 2 fasteners in each flat of the panel, so you’ll need to pre-drill holes near both sides of each high rib as shown here.
Mark each hole that will be required for your panel attachment, and then using a one 8th inch drill bit designed for drilling into metal, drill at each location you marked as demonstrated here.
Once all the holes have been drilled, you’re ready to start the installation of your roof panels.