This tutorial focuses on assembling the roof trusses before they are lifted into position as part of a Worldwide Steel Buildings kit. The tutorial walks through how the truss components come together to form the main roof-supporting members. It highlights component orientation, connection points, and preparing each truss for installation, helping DIY builders and installation crews understand how this step fits into the overall construction sequence.
What You'll Learn
- How the roof-truss components fit together
- How to orient and connect the truss members
- How to prepare an assembled truss for lifting
Video Transcript
Now that your sidewall columns and girts are installed, you are ready to install your roof trusses. The roof truss will be the support for your roof purlins and ultimately your roof panels. For this example, we are using World Wide Steel’s web truss column and roof beam framing system. Your building kit may have location-specific roof trusses. If so, they will be marked indicating the specific grid line or location where they are to be installed.
For instance, the roof truss that will be along grid A and on the grid one side of the building would be marked as A1.
If you do not have location-specific roof trusses, then they will not have location identification on them, and these can be placed at any grid line that does not have specific roof trusses for it.
Specific roof trusses are necessary under special building conditions, such as overhang mounts and bar joist connections.
These will be identified on the ship list as shown here.
It is extremely important to place the correct roof beam in the right location in your building.
Once you have identified the roof trusses required for the grid line you are installing, lay them on a large flat area and align the connection plates together.
In this example, we are using the building concrete pad to lay out our roof trusses.
Be very careful when moving the steel trusses around on a concrete pad, as they can easily damage the concrete if dragged or dropped.
The hardware required to bolt your trusses together will be identified on your shipment list in the truss hardware list section as bolts or nuts used at parallel truss ridge.
Once lined up, insert the bolts through the holes and thread the nuts onto each bolt.
It also may be necessary to lift the trusses slightly off the surface to be able to insert bolts.
It is a good idea to get all bolts in place before tightening the bolts and nuts all the way. This allows you to make any slight adjustments to the connection plates needed.
At this point, you are ready to lift this completed roof truss into place.