This installation video covers installing roof purlins between the trusses during the steel-building assembly process. Roof purlins create the secondary framing that supports the metal roof panels and helps tie the trusses together. Viewers are introduced to purlin orientation, spacing, and consistent alignment across the roof, making the tutorial useful for both first-time DIY builders and experienced jobsite crews.
What You'll Learn
- How roof purlins connect the trusses
- How to maintain proper purlin spacing and orientation
- How purlins create support for the roof panels
Video Transcript
Now that your trusses are in place, it’s time to install your purlins.
Purlins are the secondary members that will make up the roof of your building.
It is important to note that in this example, we are using World Wide Steel Building’s web truss columns and roof trusses with 6-inch purlins on the roof and 3 and five-eighths inch girts on all walls.
If your building kit has different components than noted, then the dimensions you will need to use may vary from this video.
Please be sure to verify the dimensions against your W drawings.
The placement of purlins is important to ensure that the trusses are not leaning in or out, so please make sure that you have the correct purlin for each location by referencing your W drawings and your ship list.
On the galvanized secondary framing list, you will have the location or use for each secondary member.
Locate the secondary members that indicate they are purlins for the bay you are currently installing.
In this example, starting at grid one on your W drawings, the 1st frame is set 6 and five-eighths inches back from the end wall.
For buildings with no gable extension, each purlin that is installed in the bay between grids one and 2 is marked at 6 and five-eighths inches from the end of the purlin.
This mark should line up with the center of the preinstalled welded clip on top of your grid one truss.
Attach with 4 number 12 Tek screws as shown here.
If your building has a gable extension, you will need to add the extension length onto this 6 and five-eighths inch dimension prior to marking.
For example, if you have a one foot 0 inch gable extension noted on your W1 drawing, you will need to add the one foot 0 inches to the 6 and five-eighths inch dimensions, which is a total of one foot, 6 and five-eighths inches.
Measure this distance from the end of the purlin and make a mark for the center of the welded clip as shown here.
Do this for each purlin required in the bay you are installing.
Once your marks have been made, line it up along the center of the preinstalled clip of your outer truss.
It is a good idea to utilize a locking C-clamp to hold the purlin in place at each end before attaching it to the clip using 4 number 12 Tek screws as shown here.
The C-clamp can be removed once the Tek screws are installed.
Attach the other end of the purlin to the adjacent truss, making sure the purlin lines up in the center of the truss.
If the purlin does not line up perfectly at 1st, don’t worry. This is common, and your trusses may need to be pushed or pulled to line up correctly.
Because the purlin stops at the center line of the 2nd truss’s preinstalled clip, you will only use 2 Tek screws to install.
Continue this installation method for all the remaining purlins in your bay.
When you have an intermediate bay where neither truss you are installing purlins on are the last frame in your building, then each end of your purlin will line up with the center line of the preinstalled clip, and each end will only require 2 Tek screws to install.
Once all purlins have been installed, it’s time to install your roof wind rod bracing.