Video Description
This installation video covers installing metal roof panels over the framed overhang during the steel-building assembly process. The panels extend the weather-resistant roof surface beyond the main building wall and across the projection. Viewers are introduced to panel alignment, overlap, edge positioning, and consistent fastening into the overhang purlins, making the tutorial useful for both first-time DIY builders and experienced jobsite crews.
What You'll Learn
- How to align roof panels across the overhang
- How to manage panel overlap and edge position
- How to fasten panels into the overhang purlins
Video Transcript
Now that your overhang purlins are in place and your overhang roof panels have been pre-drilled, it’s time to install them along your overhang roof.
1st, you’ll need to identify the panels that are supposed to be installed for the roof surface you’re working on. Refer to the sheet metal trim package list located in your ship list. This page will indicate what panels and lengths are to be used at each surface of your building.
World Wide Steel typically bundles panels together for each surface on your building, but it’s a good idea to verify you have the correct panels before pre-drilling and installing.
World Wide Steel’s typical roof panel has a total of 5 high ribs and 8 smaller intermediate ribs.
The high ribs are spaced 9 inches apart. The panel is designed to lap and has a 36-inch coverage. This is the dimension from the center of the 1st high rib to the center of the last high rib.
One side of your panel is referred to as the overlap edge, which is the side shown here.
The other side is referred to as the side lap edge, shown here.
When installing your roof panels, you may start from either the left or the right side of your building, working your way along the distance of your roof surface. In our example, we’re starting from the left side and working to the right. Therefore, the overlap edge of our panels will be positioned on the left side when stack drilling.
If you elect to install from right to left, then your overlap edge will be positioned on the right side.
World Wide Steel recommends installing foam closure strips along your eave trim to seal out moisture and pests.
When you install your inside foam closure strips, make sure it is aligned with your planned panel layout so that the high rib of the foam strip nests inside the high rib of your panel.
Place your 1st overhang roof panel into position, ensuring that the left edge of your panel lines up with the outside edge of your overhang.
If you pre-drilled your panels correctly, then your holes should line up perfectly with your purlins.
Your overhang roof panels will require a 2-inch overlap from the eave trim.
Each high rib along the outside edge of the panel should be checked prior to screwing into place.
This step should be done at every panel before securing with painted sheet metal screws along the bottom row, through the eave trim, and into the purlin.
Follow with the top row and finally, the lap seam rows.
When placing your second panel, overlap with the 1st panel and measure your overhang to ensure it is plumb before securing with screws.
When you reach the end of your overhang, you may need to trim your final panel so that it ends flush with the edge of your building. Measure the distance, mark your panel,
and cut.
Place your final panel and secure in place.