This installation video covers installing the purlin located at the low edge of the roof during the steel-building assembly process. This member supports the roof panel near the eave and helps define the transition from roof to wall. Viewers are introduced to eave-line alignment, consistent elevation, and coordination with trim and panel installation, making the tutorial useful for both first-time DIY builders and experienced jobsite crews.

What You'll Learn

  • How to set the purlin at the low roof edge
  • How to maintain the correct eave-line elevation
  • How the purlin supports roof panels and trim

Video Transcript

The low eave purlin will be the secondary member that your roof panel and the top of your wall panel attach to.

It’s important that these are lined up properly using the following steps.

For this example, we’re using our standard web truss building with 6-inch roof purlins.

Your eave purlin consists of 2 members. The 1st member is referred to as track. This is listed as T-620 on your shipment list and labeled as nested eave purlins. This track is shipped in standard lengths and may need to be cut down to your required dimensions.

Verify the required dimensions against your W drawings.

If your building has an eave extension, then your installation procedure will be similar to the one outlined in this video.

The end of the eave extensions will have a pre-welded clip where the eave purlin will be installed.

Refer to our eave extension installation video for more information.

Locate the preinstalled eave clip on your roof beam, shown here.

This will be the attachment point for the track.

Be sure to have locking C-clamps on hand to ensure a smooth installation.

As you can see on your W drawings, the purlin required to use from grid one to grid 2 is 8 foot 0 inches. Measure and mark this dimension on your track before making your cut.

Starting at grid one on your W drawings, the 1st frame end is set at 6 and five-eighths inches from the end wall.

Measure 6 and five-eighth inches from the end of one side of the track and make a mark. This mark will line up with the center line of the roof clip.

If your building has a gable extension, you’ll need to add the gable extension dimensions to the 6 and five-eighth inches.

Since the frame at grid 2 is an intermediate frame, the track will stop at the center line of the roof beam and of the preinstalled clip.

Place your track on the outside of the preinstalled clip with legs pointing away from the building, as shown here. Hold in place at both ends with your locking C-clamps.

The top edge of the track needs to line up with the top surface of the roof purlins. In our example, we’re using a miscellaneous piece of galvanized secondary and laying it on top of multiple purlins along the slope of the roof.

Loosen the C-clamp on one end of the track and adjust the track vertically until the top of the track is in line with the rest of the purlins.

Repeat this alignment process for the other end of the track.

Along truss line one, because the track continues past the clip, you’ll install using 4 Tek screws, as shown here.

Along truss line 2, because the track stops at the center line of the preinstalled clip, you will only use 2 Tek screws, as shown here.

Continue installing the track for the eave purlin in this method down the side wall of your building until complete.

At this point, you’re ready to install the nested eave purlin into the track. This nested purlin will give you the vertical, flat surface that your wall panels will attach to at the top of your wall.

Locate a roof purlin for the bay you’re installing the eave purlin by referencing your W drawings and your ship list.

The ends of your eave purlin should line up exactly with the ends of the track you installed at the eave. Nest the purlin inside the legs of the track as shown.

The purlin should be attached to the track through the bottom leg of the purlin and track with one Tek screw every 2 foot 0 inches on center down the length of the purlin.

The top of the nested purlin should be attached through the top back side of the track into the return leg of the purlin as shown every 2 foot 0 inches on center down the purlin.

Do not install screws through either the top leg of the track or the vertical face of the eave purlin, as these surfaces are where your roof panels and wall panels will attach.

Continue installing the nested eave purlin down the length of your building.

Got a Question?

Contact us to get started on your own steel building.

View SMS Terms & Conditions

By opting into SMS from a web form or other medium, you are agreeing to receive SMS messages from Worldwide Steel Buildings. This includes SMS messages for appointment scheduling, appointment reminders, post-visit instructions, lab notifications, and billing notifications. Message frequency varies. Message and data rates may apply. See privacy policy at https://www.worldwidesteelbuildings.com/privacy-policy/. Message HELP for help. Reply STOP to any message to opt out.

‹ Previous Video

Chord Brace at Double Purlin or Girt Install

Next Video ›

Gable Track Installation

Testimonials

Real Stories. Real Results.

Posted on Google Google
Zach Zaroor profile picture
Zach Zaroor
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
I worked with Jayson in sales. Told him what we were looking for, plans changed, and he quickly adapted with them. He was helpful, always answers the phone, and is willing to walk you through anything in further detail that you need. I will be using not only Jayson, but Worldwide Steel Buildings again in the future.
Posted on Google Google
Clayton Ericson profile picture
Clayton Ericson
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Worked with Wendy on our project, she was very helpful from start to finish. Decided on a 24 x 36 hybrid building. The building went up without any real problems. If i did have any questions she was right there to answer my questions. I chose the hybrid version with wood purlins. This saved me about $2500 and made it easier to assemble by myself. Im very happy with my shop and have had no issues with it. Wendy made my project easier with her knowledge and help. Dean E.
Posted on Google Google
MattNC Video profile picture
MattNC Video
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Great experience with WWSB and Wendy Wickenhauser in the process of designing, ordering and receiving my custom shop design. I was very pleased with the entire process, communication and product delivered. I built it myself and the included guidebook was also extremely helpful.
Posted on Google Google
Susan Bowers profile picture
Susan Bowers
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We are extremely satisfied with our Worldwide steel building. Wendy was very helpful with the design and making sure we thought about all options. Wendy and all the tech people were very helpful during the construction phase, which we did ourselves. I’m sure that sometimes our techniques were not OSHA approved, but no body died! lol.
Posted on Google Google
Krystal Burrows profile picture
Krystal Burrows
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
I’ve had a great experience working with Jerad Henry on my metal building project. He has spent hours with me going through the design and functionality of the building, answering questions, and offering insights I honestly wouldn’t have thought of on my own. His knowledge and patience made the entire process smooth and stress-free, and it’s clear he genuinely cares about getting the building right for my needs. It’s been a pleasure working with Jerad Henry, and I’m really looking forward to receiving and building the building.
Posted on Google Google
Bayou Construction & Consultants profile picture
Bayou Construction & Consultants
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
As a General Contractor, who has been building structures around the world, working with Jerad Henry and the team of professionals here at Worldwide Steel Buildings has been a fresh air experience. Jerad has made easy for us to provide great structures for clients from here in Texas to Colorado to South Carolina. The mixture of his dedication to the clients to his manufacturing team design and construction of the buildings to seamless delivery to the job site, has made our crews lives easy and efficient. Here is to our continued future working together. Thanks!!!
Posted on Google Google
Melissa 'Missy' Mihelich profile picture
Melissa 'Missy' Mihelich
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Jerad is an absolute gem! He has worked and helped us so much with our building... basically a Barndominium. Only positive experiences and thank you!
Posted on Google Google
Matt Brown profile picture
Matt Brown
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Wendy and the entire staff at World Wide were great to work with. I was very pleased with the customer service and building quality

Not Sure Which Roof System Is Right for Your Building? We can help!

Our team can help you compare roof system options based on your building use, budget, location, and desired appearance.

Back To Top