This tutorial focuses on installing the framing for an eave extension as part of a Worldwide Steel Buildings kit. An eave extension projects beyond the wall line to create additional roof coverage and a finished overhang. It highlights extension alignment, connection to the main roof framing, and preparation for soffit and trim, helping DIY builders and installation crews understand how this step fits into the overall construction sequence.
What You'll Learn
- How the eave-extension framing connects to the roof
- How to align the projection beyond the wall line
- How to prepare the extension for soffit and trim
Video Transcript
Welcome to the World Wide Steel Building’s low eave extension installation video.
If your building has a low eave extension, it will be noted on your W drawings as shown here.
Eave extensions range from a one-foot extension up to a three-foot extension.
In this example, we have a one-foot extension. If your building has a different extension length, then it will be noted on your W drawings.
Eave extensions require the installation of eave extension trusses on top of your roof trusses.
These trusses will be identified on the building shipment list and are installed using bolts, nuts, and washers identified on the truss hardware list.
The low side of your eave extension will have a pre-welded clip attached to it for the eave purlin to be installed at the end of the extension.
It will also have pre-welded clips on each side of the extension to install the building eave purlin at the wall.
Start by placing an eave extension on top of your roof truss.
Each extension will use 2 bolts, 4 washers, and 2 nuts for the install.
Place one washer on the bolt, then place the bolt in between the angles of the top flange of the roof beam and through the angles of the bottom flange of the eave extension.
Then place another washer on the bolt, followed by the nut. Finger-tighten to allow for some adjustment when lining up the eave purlin at wall.
Now place the 2nd set of bolts, nuts, and washers in place and finger-tighten.
In this example, since we are using 3 and five-eighth inch girts, when adjusting the eave extension, the clips that will hold the eave purlin at the wall line will be 3 and five-eighths inches from the outside face of your column to the inside of the clips. Your eave purlin at the wall line will be the top attachment point for your wall panels, so making sure it is lined up correctly is very important.
Adjust the location of the eave extension up or down slope as needed. Once adjusted, tighten all bolts and nuts to secure the extension in place. Continue placing your eave extensions on the sidewall roof trusses until all eave extensions are installed. Once completed, you will be ready to install your low eave purlin at wall onto your eave extensions.