Video Description
This tutorial focuses on assembling the bird box trim for a Worldwide Steel Buildings kit with an eave extension. The bird box is part of the soffit extension trim system at the gable ends, providing a clean, finished transition where the eave soffit ends. It covers the process of measuring, marking, cutting, bending, and notching the trim, including creating 45-degree corner cuts and making adjustments for buildings with gable extensions. This video helps DIY builders and installation crews understand how to properly prepare and assemble the bird box before completing the installation in Part 2.
What You'll Learn
- How to measure and mark your bird box trim
- How to cut your trim
- How to properly bend your trim
Video Transcript
Welcome to the Worldwide Steel Buildings bird box installation video. This is part I of a two-part series.
On a Worldwide Steel Buildings kit, a “bird box” is part of the soffit extension trim system at the gable ends. It serves to close the transition where the eave soffit ends, and provide a clean, finished look.
If your building has an eave extension, then you will need to assemble and install a bird box.
The bird box is assembled from a single piece of post trim.
Post trim will be shown on your sheet metal trim package list, and will be identified as “at eave extension corners”.
Once you have your trim, start by marking your bird box. Since our building has a 12” inch eave extension, we will make a mark at 12 inches. If your building has a different extension length, then it will be noted on your W-drawings. This first measurement is where the bird box will meet and bend at the gable post trim, as shown here.
Make a second mark at 24 inches. This is where the bird box bends around the low eave purlin at the end of the eave extension.
Using a square, draw a line along the post trim face, and along the post trim leg at the marks you just made.
Using the appropriate pair of hand snips, cut post trim leg along both lines as demonstrated here.
Once your cuts have been made, it’s time to bend your trim. To ensure your corners are clean, place your trim on a solid surface, place your square along the line of your post trim face, and simultaneously pull the trim up while pushing the square down. Finish the bend by gently squeezing the trim to a 45-degree angle as demonstrated here.
Repeat this process for your second bend.
Your bird box should now look like this.
At this point you have the option of leaving your corners squared or cutting the tabs at 45 degrees to give them a more finished look.
To add a 45-degree cut, use your square to mark a 45-degree line along the tab. Next, open your bend, and using the appropriate pair of hand snips, cut along the line. This results in a clean, finished look.
If your building has a gable extension, then you will need to notch out the trim where the birdbox meets the gable track as shown here.
Measure a notch that’s 1 ½ inches from the bend, and 1 ¼ inches deep. Cut with hand snips as demonstrated here.
Finish by gently pulling the tab outwards.
Your bird box is now ready to be installed. Please proceed with Part II of our Bird Box Installation series.
Thanks for choosing Worldwide Steel Buildings. Got a question? Give us a call at 1-800-825-0316, or visit our website at worldwidesteelbuildings.com.